Does the sewer system services need to be shut down for installation to take place?
- Feb 13, 2014
- admin
- 0 comments
With the use of STAR, at no time does the service laterals or the mainline need to be shutdown. With flows that exceed 50% of the carrying capacity of the sewer, a by-pass pumping system may be installed per the discretion of the contractor.
Add new comment