Does the sewer system services need to be shut down for installation to take place?

Error message

  • Notice: Trying to access array offset on value of type int in element_children() (line 6595 of /home4/belassal/public_html/cabotics/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6595 of /home4/belassal/public_html/cabotics/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6595 of /home4/belassal/public_html/cabotics/includes/common.inc).
  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/belassal/public_html/cabotics/includes/common.inc).

With the use of STAR, at no time does the service laterals or the mainline need to be shutdown. With flows that exceed 50% of the carrying capacity of the sewer, a by-pass pumping system may be installed per the discretion of the contractor.

Add new comment

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Image CAPTCHA
Enter the characters shown in the image.