What is the economic comparison between STAR and the traditional model?

Error message

  • Notice: Trying to access array offset on value of type int in element_children() (line 6595 of /home4/belassal/public_html/cabotics/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6595 of /home4/belassal/public_html/cabotics/includes/common.inc).
  • Notice: Trying to access array offset on value of type int in element_children() (line 6595 of /home4/belassal/public_html/cabotics/includes/common.inc).
  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/belassal/public_html/cabotics/includes/common.inc).

Our economic model is a key advantage. STAR is typically 8 to 10 times faster than traditional construction methods at a savings of 33% to 66%, also eliminating the risk associated with open cut or directional drilling.

Add new comment

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Image CAPTCHA
Enter the characters shown in the image.